Quality Control System

Video

Strength Test Control Automatic Pull Strength Test Device Hooks, wire ropes, casings, rope drums, etc. are tested according to the standard

Strength Test Control
Automatic Pull Strength Test Device

Hooks, wire ropes, casings, rope drums, etc. are tested according to the standard

Strength Test Control Automatic Pull Strength Test Device

Strength Test Control
Automatic Pull Strength Test Device

The pull-proof and control lines are tested according to the standard for each batch of tension and loosening prevention

Dimensional Accuracy Control Dimensional Projector

Dimensional Accuracy Control
Dimensional Projector

Projector judgment measurement for parts with strict precision requirements

Dimensional Accuracy Control High-accurancy Gear test Device

Dimensional Accuracy Control
High-accurancy Gear test Device

measure the gears and pinion shafts of various specifications of the company's products according to the specified standards

Components Test Control Constant Temperature Control machine

Components Test Control
Constant Temperature Control machine

The materials of stator lead wire, thermal protector and slot paper are tested and compared in the standard temperature range

Components Test Control Constant Temperature Control machine

Components Test Control
Switch Durable Test Device

Switch durability test

Machine Workshop

Machine Workshop

Metalworking and stamping parts are inspected for the first time. After confirming that they are qualified, the first inspection list is placed and the first product is placed in the first table. Inspection is carried out every 2 hours, and first inspection records are made.

Motor Workshop

Motor Workshop

After the first inspection of the first piece of stator of each specification is confirmed as qualified according to the standard, the first inspection sheet and the first piece of stator are placed in a fixed position on the workbench, and 100% full inspection of the stator on the assembly line is carried out;

Assembly workshop

Assembly workshop

1The current parameters, withstand voltage, running machine, hoisting weight, appearance, etc. are tested for hoists of various specifications.


Assembly workshop

Assembly workshop

2. Confirm the first piece of wiring unit inspection, and place the first piece of bench seal after passing the test until the production of the batch number is completed.

Final Inspection Control

100% inspection to parameters of final products

100% inspection to parameters of final products

Multipurpose assistance for online stores and offline retailstores and stores and offline retailstoresstores and offline retailstoresstores and offline retailstores

100% inspection to lifting capacity of final products

100% inspection to lifting capacity of final products

the hoist test and packaging material packaging involve foreign trade, production, and quality participation in the first inspection and confirmation of the first piece.

Random durability testing of finished products

Random durability testing of finished products

Each batch of finished products is randomly selected for 1-2 units for durability test, and 2000 cycles of full lifting capacity test are done on a 20-meter high test tower.

Random lifting capacity test of finished products

Random lifting capacity test of finished products

In each batch of finished products, 2-3 units are randomly selected for lifting weight test, and static load test and dynamic load test are carried out in full accordance with GS/CE/ETL certification standards.

Quality Improvement Control

1

Data Analyze

Every week & month take analyzation of the defects and make improvements.

2

Quality Improvement

According to QC seven tools. Brainstorm for quality analysis.
Carry out quality research according to the 28 rule

Fill out the form to contact us, We promise to respond to you quickly.

Inquiry